ASME B31.3

Process Piping

Welding Procedure

Summary

Covers piping typically found in petroleum refineries, chemical plants, pharmaceutical plants, textile plants, and cryogenic plants.

Scope

Design, materials, fabrication, assembly, erection, examination, inspection, and testing of piping.

Key Requirements

Examination Requirements

Chapter VI defines examination requirements.

  • Normal service: VT + sampling NDT per Table 341.3.2
  • Category M (lethal): 100% RT or UT of girth welds
  • High Pressure: 100% RT or UT

Preheat Requirements

Table 330.1.1 defines minimum preheat based on P-Number, thickness, and carbon equivalent.

PWHT Requirements

Table 331.1.1 defines PWHT requirements.

  • P-1 (carbon steel): required above 19mm
  • P-4 (chrome-moly): typically required
  • P-8 (austenitic SS): generally not required

Applicable Materials

Carbon SteelLow Alloy SteelStainless Steel 304Stainless Steel 316Chrome-Moly (P91)Chrome-Moly (P22)Duplex Stainless SteelNickel Alloys

Applicable Processes

SMAWGMAWGTAWFCAWSAW

Related Cross-References

Carbon Steel+Carbon Steel|GTAW|Butt

Fillers: ER70S-2, ER70S-6

View full lookup details
Stainless Steel 304+Stainless Steel 304|GTAW|Butt

Fillers: ER308L, ER308LSi

View full lookup details